ELITE EIGHT
CRG Residential renovated 109 units in five buildings across the span of four months using R.A.P.I.D. Occupied, where the crews renovate three units a day.
The scope included demolition of all existing flooring, cabinets, tops, doors, trim, and bathrooms. Once the original materials were out, new lighting fixtures, washer and dryer connections, shower valves, electrical panels, and USB connections in the kitchens were all installed. The tubs were replaced with walk-in shower stalls with sliding glass doors and new backsplash was added to both the bathrooms and kitchens. New laminate plank flooring was also laid throughout and to finish off the units, the walls, ceilings, and trim received a fresh coat of paint and new blinds were put on the windows.
In addition to the traditional R.A.P.I.D. package, CRG also removed some dividing walls in specific units to create a more open floor plan from the kitchen to the living room.